Tirohia te Katoa

Tena tirohia te putanga Ingarihi hei putanga mana.Whakahoki

Europeropi
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asia / Pacific
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Africa, India me Middle East
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Amerika ki te Tonga / Oceania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Te Tai Tokerau
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
HomeHuaPoari Whakawhanaketanga, Kiti, Nga TakawaengaPoari Aromātai - DC / DC & AMP;AC / DC (Off-Raina) SPSTPSM84A21EVM-808
TPSM84A21EVM-808 Image
Ko te ahua pea he kanohi.
Tirohia nga Whakariterite mo nga Taipitopito Hua.
KōWHIRINGA EXPRESS
Tikanga utu

TPSM84A21EVM-808 - Texas Instruments

Kaihanga Tau Wae
TPSM84A21EVM-808
Kaihanga
Texas Instruments
Allelco Tau Wae
98D-TPSM84A21EVM-808
Te tiwhikete
1 tau Allelco Raarangi - Rapua etahi atu
Nga waahanga Whakaahuatanga
EVAL BOARD FOR TPSM84A21
Paera
Bulk
Pepa Raraunga
1.TPSM84A21EVM-80.pdf ...
Ta matou Tiwhikete
I roto i te taonga: 45979
  • Utu Tau: $58.80
  • Tuatoru: $0.00

Kei te hiahia koe he utu pai ake?
Tāpiri ki te kaata me Tukuna RFQ inaianei, whakapā atu ki a koe.

Maha Utu Tau Peke.Utu
1+ $58.80 $58.80
Kaore nga utu i runga ake nei e whakauru i nga taake me nga reiti aukati, ka kiia i runga i nga whaarangi ota.
KōWHIRINGA EXPRESS
Tikanga utu
Ta matou Tiwhikete

Ngā whakaaturanga

TPSM84A21EVM-808 Whakaritenga Hangarau
Nga Hangarau Hangarau Texas Instruments - TPSM84A21EVM-808, nga tohu, nga taatai me nga waahanga me nga taapiri rite ki Texas Instruments - TPSM84A21EVM-808

Huanga hua Uara huanga  
Kaihanga Texas Instruments  
Putanga - Whakaputa 0.6V, 0.8V, 1V, 1.1V or 1.2V  
Momotuhi - Whakauru 8V ~ 14V  
Whakamahia IC / Wahanga TPSM84A21  
Tuhinga kua Whakaratohia Board(s)  
Raupapa SWIFT™  
Topology Whakahaere Buck  
Huanga hua Uara huanga  
Pūhera Bulk  
Ngā Hua me te Momo 1, Non-Isolated  
Te Tumuaki Matua DC/DC, Step Down  
Rautanga - Whakawhiti 4MHz  
Nama - Whakaputa 10A  
Poari Poari Fully Populated  
Tau hua hua TPSM84  

Te Tauira Taiao me te Kaweake

TOHU WHAKAAHUATANGA
RoHs Tūnga Kāore e hāngai ana
Taumata Maha Kore (MSL) 1 (Unlimited)
Tutuki te mana REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Waahanga me nga whakaritenga rite

Ko nga waahanga e toru kei te taha matau he rite nga whakaritenga ki Texas Instruments TPSM84A21EVM-808.

Huanga hua TPSM84A22EVM-809 TPSM846C23EVM-806 TPSM846C23DEVM-807 TPSM846C24DEVM-007
Tau Wae TPSM84A22EVM-809 TPSM846C23EVM-806 TPSM846C23DEVM-807 TPSM846C24DEVM-007
Kaihanga Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Tau hua hua - DAC34H84 MAX500 ADS62P42
Putanga - Whakaputa - - - -
Raupapa - - - -
Nama - Whakaputa - - - -
Momotuhi - Whakauru - - - -
Ngā Hua me te Momo - - - -
Pūhera - Tape & Reel (TR) Tube Tape & Reel (TR)
Rautanga - Whakawhiti - - - -
Poari Poari - - - -
Tuhinga kua Whakaratohia - - - -
Whakamahia IC / Wahanga - - - -
Te Tumuaki Matua - - - -
Topology Whakahaere - - - -

TPSM84A21EVM-808 Datasheet PDF

Tangohia a TPSM84A21EVM-808 PDF Datasheets me Texas Instruments tuhinga mo TPSM84A21EVM-808 - Texas Instruments.

Raraunga
TPSM84A2xEVM-808,809 User Guide.pdf

Arotake Kaihoko

Mātai pūmanawa: 10 tuhinga

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Tuhia he arotake

Kaore e whakaputaina to wahitau imeera.

Tuhinga

Te wa tuku

Ka taea te tuku i nga taonga-a-roto i roto i nga haora 24.Ko etahi waahanga ka whakaritea mo te tuku i roto i nga ra 1-2 mai i te ra i tae mai nga taonga katoa ki ta maatau whare putunga.Me nga kaipuke a Allelco i te ra kotahi i te 17:00, haunga te Rātapu.Ina tukuna nga taonga, ko te wa tuku e kiia ana ko te tikanga tuku me te haerenga tuku.Ko te ripanga i raro nei e whakaatu ana ko te waa arorau mo etahi whenua noa.

Nga utu tuku

  1. Whakamahia to putea Express mo te tuku mehemea kei a koe tetahi.
  2. Whakamahia ta maatau putea mo te tuku.Tirohia te tepu i raro nei mo nga utu tata.
(He rereke nga waahi / whenua / rahi te rahi o te rahi.)

Tikanga tuku

  1. Te tuku noa a te Ao mo te DHL / UPS / FedEx / TNT / EMS / SF e tautoko ana matou.
  2. Ko etahi atu ka piki haere, Tena koa hono atu ki to Kaiwhakahaere Kaihoko.

Nga whenua o nga whenua e tohu ana i te waa
Takiwā Whenua Te wa arorau (ra)
Amerika United States 5
Brazil 7
Europeropi Tāpā 5
United Kingdom 4
Itari 5
Moana o Oceania Ahitereria 6
Aotearoa 5
Āhia Kirinuku 4
Japan 4
Rawhiti Rawhiti Ia Iharaira 6
DHL & FedEx kaipuke tuku utu
Nga utu kaipuke (kg) Tohutoro DHL (USD $)
0.00KG-1.00KG USD $ 30.00 - USD $ 60.00
1.00KG-2.00KG USD $ 40.00 - USD $ 80.00
2.00kg-3.00KG USD $ 50.00 - USD $ 100.00
Panui:
Ko te tepu i runga ake nei mo te tohutoro anake.Kei kona ano etahi o nga raraunga mo nga mea kaore e taea te whakahaere.
Whakapaa mai ki te mea kei a koe etahi patai.

Tautoko utu

Ka taea te whiriwhiri i te tikanga utu mai i nga tikanga e whakaatuhia ana i raro nei: Whakawhiti waea (T / T, Whakawhiti Bank), Western Union, Kaari nama, PayPal.

Ko to hoa mahi tinihanga pono -

Whakapaa mai ki te mea kei a koe etahi patai.

  1. Waea
    +00852 9146 4856

Tiwhikete me nga Mema

Tirohia atu
TPSM84A21EVM-808 Image

TPSM84A21EVM-808

Texas Instruments
98D-TPSM84A21EVM-808

Kei te hiahia koe he utu pai ake? Tāpiri ki te kaata me Tukuna RFQ inaianei, whakapā atu ki a koe.

0 RFQ
Te Kete Hoko (0 Items)
He kau.
Whakatauhia te raarangi (0 Items)
He kau.
Urupare

Ko o mea urupare!I Allelco, ka aro nui matou ki te wheako kaiwhakamahi me te ngana ki te whakapai ake i nga wa katoa.
Tena koa tohatoha atu ki a maatau korero ma te maatau urupare, a ka whakautu wawe matou.
Mauruuru koe mo te whiriwhiri Allelco.

Whakataka
Ī-mēra
Ko nga korero
Aronui
Toia, paato ranei ki te tuku i te konae
Tukuatu Kōnae
Nga momo: .xls, .xlsx, .DOC, .docx, .jpg, .png and .pd and .pdf.
Rahi Kōnae Aaa: 10MB